Residential Development South Africa
Steelpoort, South Africa, is building a new settlement. In addition to traditional residential construction, W&P will construct public facilities such as hospitals and shopping malls.

The goal is to create a dependable sustainable energy, waste, and wastewater concept.
The overarching consideration can be used to leverage synergies. This increases the system's efficiency.
Reccomended projects
Bereuter Kieswerke – Volketswil, Switzerland
For industries with expansive local PV-generation and impending substantial electrical power requirements, a battery energy storage system (BESS) can be a cost- effective solution as opposed to upgrading the grid infrastructure. Complementing the BESS with fast-charging stations for electric trucks can help maximise the self-consumption of renewable electricity and at the same time reduce costs and emissions.
Discover more about our approach



